Post Date: 06 May, 2016
Status: Approved
In lieu of installing rack space for future carbon filters, an execution plan for future modifications to the HVAC system to create rack space for carbon filters may be provided in the event that the installation of carbon filters is a requirement of the WELL Building Standard in the future. To follow this approach, it must be confirmed that the system would be able to physically accept carbon filters should the necessary rack space be created, the plan must identify the cost estimates of renovating the HVAC system to include the necessary rack space to confirm that it is considered a capital improvement item, and the owner must commit to making the upgrades should the WELL Building Standard require carbon filters in a future recertification of the project.