Posted on: 27 Apr, 2017
Amendment: Add: "occurring within one year prior to Performance Verification" after "building construction"
|
Posted on: 27 Apr, 2017
Amendment: Add: "occurring within one year prior to Performance Verification" after "during construction"
|
Posted on: 27 Apr, 2017
Amendment: Add: "occurring within one year prior to Performance Verification" after "building construction"
|
Posted on: 27 Apr, 2017
Amendment: Add: "newly installed" after "all"
|
Posted on: 06 May, 2016
Amendment: Change title of Part 3 from "VOC Absorption Management" to "Moisture Absorption Management"
|
Posted on: 06 May, 2016
Amendment: In Part 3, change "To prevent building materials from absorbing and later releasing VOCs emitted by other (source) materials during construction, the following requirements are met: to "To prevent building materials from absorbing water or moisture during construction, the following requirements are met:"
|
Posted on: 06 May, 2016
Amendment: In Part 3a, change “A secure area is designated to store and protect…” to “A separate area is designated to store and protect…”.
|
Posted on: 06 May, 2016
Amendment: Remove Parts 3b and 3c.
|
Posted on: 06 May, 2016
Interpretation:
My project is an existing project; does Feature 7 apply to my project?
Ruling: For existing projects, it must be demonstrated that the requirements of Feature 7 were met for all construction/renovation/alteration activity that took place during the process of readying the project for WELL certification and all construction/renovation/alteration activity that occurred within 1 year prior to the WELL project registration. If no such activity took place within 1 year prior to the WELL project registration, the feature requirements are met. |