Posted on: 06 May, 2016
Amendment: Change “The VOC content of all newly installed thermal and acoustic insulation in ceilings and walls…” to “The VOC content of all newly installed thermal and acoustic insulation inside the waterproofing membrane…”
|
Posted on: 10 Feb, 2016
Interpretation:
Feature 4 Parts 1 through 5 apply to newly applied/installed/purchased products and materials. What products and materials are considered to be ‘new’?
Ruling: Products or materials applied or installed within a timeframe of, at a minimum, one year prior to the WELL project registration are considered to be 'new.'
UPDATED RULING. Post Date 1/11/2017.
Ruling: Products or materials applied or installed within a timeframe of, at a minimum, one year prior to the WELL Performance Verification are considered to be 'new.' |
Posted on: 10 Feb, 2016
Amendment: Under Part 1c, delete "VOC control" and replace with "VOC content".
|
Posted on: 10 Feb, 2016
Amendment: Under Part 2c, delete "VOC control" and replace with "VOC content".
|