Requirement:
b
Description:
Rollout mats, at least the width of the entrance and 3 m [10 ft] long in the primary direction of travel.
Support Threshold:
USGBC's LEED v4: Reference Guide for Building Design and Construction EQ Credit: Enhanced Indoor Air Quality Strategies requires permanent entry walk-off systems.
Part:
Permanent Entryway Walk-Off Systems
RecDocTitile:
LEED v4: Reference Guide for Building Design and Construction