Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 Replace the existing Part 1 text with the following: The projects demonstrates compliance with one of the following: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 Change the name of the feature from "ADA Accessible Design Standards" to "Accessible Design" |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 06 May, 2016 Projects in Canada may utilize the Ontarians with Disabilities Act (AODA), as amended January 1, 2015, as an equivalent local standard to the Americans with Disabilities Act (ADA). |
06 May, 2016 |
Equivalency |
Type: Equivalency
Post Date: 06 May, 2016 The UK Part M Volume 2 Standard (Buildings other than dwellings) may be used lieu of the 2010 ADA Standards for Accessible Design as long as the following additional requirements are met: 1. Signage adheres to the requirements of BS 8300: Design of buildings and their approaches to meet the needs of disables people, as referenced within the Part M Volume 2 Standard. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In Part 1a, change "Buildings" to "Projects" |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jul, 2017 The European Standard EN-1335 and Dutch Standard NEN 1812, Type A and Type B only, have been approved as acceptable alternatives to HFES 100. Please note EN-1335 Type C has not been approved as an acceptable alternative. |
17 Jul, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 For Feature 73, Part 2, the project may provide height adjustable tables and meeting tables apart from workstation desks to meet the feature requirements. |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 For Feature 73, Part 2, the project may provide a lower threshold of the required initial percentage of sit/stand workstations required by the feature, in conjunction with a future purchase commitment and an educational campaign. The campaign must encourage walking during the working day and highlight the benefits of sit-stand desks. The project must also provide instructions to occupants on how to request a sit-stand desk. The project must provide sit-stand desks in multiple options/styles (for trial use by occupants) and commit to accommodate all occupant requests for a sit-stand desk, even in exceedance of the feature requirement. |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 For Part 3 (Seat Flexibility), alternative seat height adjustability and seat depth adjustability ranges may be accepted if the average height of the expected occupants differs significantly from the average height of the US population. |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letters of Assurance as required documentation, add on-site spot checks as required verification, remove visual inspections. |
10 Feb, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In Part 2a, change "Adjustable Height standing desks." to "Adjustable height sit-stand desks." |
10 Feb, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In Part 3b, delete "or BIFMA G1 guidelines." |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The Code for Design of Sound Insulation of Civil Buildings’ (B50118-2010) and ‘Environmental Quality Standard for Noise’ (GB3096-2008) have been approved an acceptable method to comply with F74. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "d. Teleconference rooms: maximum noise criteria (NC) of 20." |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "," after "as well as occupants themselves" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "major" after "occupants themselves can be" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "To reduce acoustic disruptions and increase speech privacy by |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "spaces and potential sources of disruption" after "the following" |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 09 Feb, 2017 Whereas Noise Criteria levels within a space is driven by sound produced by the HVAC and other mechanical systems which may be outside of a tenant’s control, New and Existing Interiors projects may achieve Feature 75 when achieving NC levels higher than listed, with the following conditions:- Achieve NC levels of 5 higher, but the project is limited to Gold level of certification, no matter how many Optimization features are achieved.- Achieve NC levels 10 higher, but the project is limited to Silver level of certification, no matter how many Optimization features are achieved. |
09 Feb, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 Noise Rating curve values may be used in lieu of Noise Criterion curve values for the mechanical equipment sound levels required in Part 2 of this feature using the same maximum criteria values listed for each space type. The project team must indicate in their documentation application if Noise Rating is to be used in lieu of Noise Criterion. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2a, change “Open office spaces and lobbies:” to “Open office spaces and lobbies that are regularly occupied and/or contain workstations:” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 09 Feb, 2017 Multifamily residential projects may certify when not supplying central-system air conditioning or air conditioning units in individual dwelling units, with the following conditions:- Outdoor air is supplied at a volume to meet Feature 3 Part 4 and is filtered to meet Feature 5 Part 2.- The developer allocates spaces for tenant-owned, supplemental air conditioning units to be installed.- The developer supplies all occupants with tenant guidelines for selecting a high-performance air conditioner unit to maximize comfort and optimize efficiency. The guidelines should detail the importance of local thermal comfort standards including environmental factors of air temperature, humidity, radiant temperature, air speed; and personal factors of metabolic rate and clothing insulation.- Projects using this option are limited to Gold level certification, no matter how many optimizations are achieved. |
09 Feb, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 17 Jan, 2017 Core and Shell residential projects may fulfill the requirements of Feature 76 by providing a narrative of how the residential units meet local thermal comfort standards (environmental factors: air temperature, humidity, radiant temperature, air speed and personal factors: metabolic rate and clothing insulation) or by providing an allowance for tenants to select an air conditioning unit of their choice from options, which would allow the unit to meet the thermal comfort requirements. |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The Green Star Credit 14 is an accepted equivalent to the requirements of Feature 76: Thermal Comfort. Compliance with the Green Star credit is sufficient to comply with the requirements of Feature 76. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 ISO 7730:2005 and/or CEN Standard EN 15251:2007 may be used in lieu of ASHRAE 55-2003 Sections 5.3 and 5.4. The requirements of these standards must be met in all spaces, rather than 75% of regularly occupied spaces in the project. When selecting either ISO 7730:2005 or CEN Standard EN 15251:2007, the most appropriate standard must be selected for the space. Note that some naturally ventilated spaces may not qualify to use CEN Standard EN 15251:2007 if certain criteria are not met.In addition, when utilizing CEN Standard EN 15251:2007, the project must comply with either Category I or Category II as described in Table A.1 of the standard in order to be within +/- 0.5 of the PMV for the space. |
06 May, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 Inquiry: In residential units, are the requirements of Feature 76 met if individual unit controls for heating are provided?Ruling: No, an exemption from ASHRAE 55 requirements may not be granted in residential units if individual unit controls are provided. It is typical for each unit in a multifamily residential development to have individual control over space temperatures with controls allowing occupants to adjust temperatures. In order to rely on the controllability of the systems as an alternative strategy, it must be demonstrated that the local controls allow occupants to set conditions within the unit to meet ASHRAE 55. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 24 Oct, 2016 Core and Shell projects pursuing WELL compliance may submit Feature 77 as an Innovation feature under Features 101-105, provided all parts of the Feature are met for the whole building scope (i.e. The building core and shell and all parts of the interior finish-out that are completed by the project owner). |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1b, change “Open office spaces:” to “Open workspaces:” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2a, change “Open office spaces:” to “Open workspaces:” |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add MEP Letter of Assurance as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 For Part 2a, add "interior" in front of "surrounding walls." |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2c, change “Cubicle style offices:” to “Partitioned office spaces:” |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1a, change “Open office spaces” to “Open workspaces:” |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2b, change “Open office spaces:” to “Open workspaces:” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The China national standard 'Code for Design of Sound Insulation of Civil Buildings' (GB50118-2010) has been approved an acceptable method to comply with F81.Note that projects must comply with the verification method according to Appendix D. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1a, change “The building provides a thermal gradient of at least 3 °C [5 °F] across open office spaces…” to “The building provides a thermal gradient of at least 3 °C [5 °F] across open workspaces…” |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add owner Letter of Assurance as required documentation, add on-site spot checks as required verification, remove visual inspection. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Feature introduction text, change “Additional benefits include saved floor space, lower dust transportation and increased thermal comfort through the separation of temperature controls and fresh air supply systems” to “Additional benefits include saved floor space, lower dust transportation and increased thermal comfort through the separation of temperature controls and outdoor air supply systems |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change Part 1 name from “Lobbies and Other Common Public Spaces” to “Lobbies and Other Common Spaces” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In feature introduction text, change “Health literacy, defined by the Institute of Medicine as…” to “Health literacy, defined by the National Academy of Medicine as…” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Prior to the design and programming of the project, all". Add: "Project" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 17 Jan, 2017 Change "…is given to a representative sample of at least 30% of employees at least once per year…" to "…is completed by a representative sample of at least 30% of employees at least once per year…" |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The Leesman Survey is an accepted alternative to the Occupant Indoor Environmental Quality Survey required for Feature 86, Part 1: Occupant Survey Content. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The BOSSA Survey is an accepted alternative to the Occupant Indoor Environmental Quality Survey required for Feature 86, Part 1: Occupant Survey Content. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The Green Star Innovation Challenge: Occupant Engagement is an accepted alternative to the requirements of Feature 86: Post-Occupancy Surveys. Therefore, compliance with the Green Star credit is sufficient to comply with the WELL feature. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add professional narrative as required documentation, remove annotated architectural drawing, remove on-site spot checks. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add professional narratives as required documentation, remove annotated architectural drawings, remove on-site spot checks. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 The requirements of Part 1b (provide employees with a 50% subsidy on software and/or applications that monitor daytime sleep-related behavior patterns such as activity levels, caffeine and alcohol intake, and eating habits) may be met if employees are provided free, doctor recommended software applications that meet these requirements. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "or any other employer-established benefit plan designed to reimburse employees for qualified medical expenses" after "Flexible spending accounts" |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The 'Five Insurance' offered under the Labor Law of the People’s Republic of China has been approved as an acceptable method to comply with F92. |
17 Jan, 2017 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Parts 1, 2, and 3 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Parts 1 and 2 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Parts 1 and 2 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "(in order to contribute, the product must indicate that all ingredients have been evaluated and disclosed down to 1,000 ppm)" after "the following material descriptions" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letter of Assurance as required documentation, add Owner Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 A corporate annual report may be used to meet the requirements of Part 1 (Transparency Program Participation) if it meetings the following requirements:1. The report includes information on each of the 22 JUST indicators (as applicable) as they apply to the organization as a whole, and areas where the organizational policies can be improved.Depending on the type of organization, certain indicators (such as hazardous chemicals) may not be applicable. The 22 JUST indicators are as follows: non-discrimination, gender diversity, ethnic diversity, full time employment, pay scale equity, union friendly, living wage, gender pay equity, family friendly, occupational safety, hazardous chemicals, worker happiness, employee benefits, continuing education, local control, local sourcing, stewardship, volunteering, positive products, charitable giving, animal welfare, and transparency.2. The report is publically available and employees are clearly made aware of how to access the report. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In feature description language, change the last sentence from "This feature uses JUST participation to support fair and equitable organizations" to “This feature uses JUST participation and G4 Sustainability Reporting Guidelines to support fair and equitable organizations." |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation, remove architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |