WELL Addenda
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1 description, change “The following conditions are met for all pesticides and herbicides used on plants:” to “The following conditions are met for all pesticides and herbicides user on outdoor plants.” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Not more than 100 ppm (by weight) added lead". Add: "Not more than a weighted average of 0.25% lead in wetted surfaces of pipes, pipe fittings, plumbing fittings, and fixtures, and 0.20% for solder or flux used in plumbing for water intended for human consumption" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add "c. Not more than 100 ppm (by weight) added lead in all other building materials." |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 NUCOR has been deemed an acceptable standard to meet the requirements of Feature 11, Part 1. It should be noted that allowable lead content in NUCOR exceed the WELL Part 1b requirement. However, NUCOR is currently deemed best in class for sheet steel at this time. |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The New York Department of Environmental Protection Asbestos Control Program and Asbestos Rules and Regulations has been approved as an equivalent to AHERA for Feature 11, Part 3.Note that projects must maintain a copy of the records produced by the asbestos investigator/abatement contractor, which should be made available to the building occupants. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add policy document as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add MEP Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1b, change “0.3 CFM fresh air per ft² of floor area” to “0.3 CFM outdoor air per ft² of floor area” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 22 May, 2017 The ISO 9972-2015 - Thernal performance of buildings - Determination of air permeability of buildings - Fan Pressurization method, is an acceptable alternative to meet WELL Feature 14 Part 1a. |
22 May, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The Green Star Innovation Challenge: Air tightness testing is an accepted equivalent to Feature 14: Air Infiltration Management. Compliance with the Green Star credit is sufficient to comply with the WELL feature. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 In lieu of performing envelope commissioning in accordance with ASHRAE Guideline 0-2005 and NIBS Guideline 3-2012 for new construction or structural renovation), the project may complete a thermographic survey, airtightness test, and inspection and correction of defects in accordance with ATTMA TSL2 guidelines. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "The following is required in terms of the rate of outdoor air supply to all regularly occupied spaces". Add: "One of the following is required in all regularly occupied spaces" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Exceed ASHRAE outdoor air supply rates met in the WELL Ventilation Effectiveness feature by 30%". Add: "Exceed outdoor air supply rates met in Feature 03, Part 1a by 30%". |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "b. Follow CIBSE AM10, Section 4, Design Calculations, to predict that room-by-room airflows will provide effective natural ventilation." |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 CEN Standards EN 15251:2007 and EN 13779:2007 may be used in lieu of ASHRAE 62.1-2013 for Feature 15, Part 1. The project must meet Category I or II (described in Table 1) and must calculate the ventilation rate based on either of the below calculation methods, referenced in EN 15251: 2007, section B.1.3 ""Method based on ventilation rate per person or per m² floor area:"" Additionally, the requirements of CEN Standard EN 15251-2007 must be met and the performance requirements of CEN Standard EN 13779:2007 related to ventilation and room conditioning systems must be met (excluding section 7.3, Thermal Environment; section 7.6, Acoustic Environment; section A.16; and section A.17). |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 AS 1668.2 may be used in lieu of ASHRAE 62.1 for Feature 15, Part 1. Note that projects that wish to comply with AS 1668.2 must increase ventilation by 50% rather than the 30% increase required when complying with ASHRAE 62.1. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change Part name from "Increased Fresh Air Supply" to "Increased Outdoor Air Supply" |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1, change "The following is required in terms of the rate of fresh air supply to all regularly occupied spaces:" to "The following is required in terms of the rate of outdoor air supply to all regularly occupied spaces:" |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1a, change “Exceed ASHRAE fresh air supply rates…” to “Exceed ASHRAE outdoor air supply rates…” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 17 Jan, 2017 Under Part 1, change the beginning of the first line to 'All cleaning and chemical storage units, all bathrooms and all rooms that contain printers and copiers…" |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add annotated mechanical and architectural drawing as required documentation, remove MEP Letter of Assurance, remove on-site spot checks. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "(measured at 1.2-1.8 m [4-6 ft] above the floor)" after "once an hour" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 In projects with strict data privacy requirements, the requirements of Part 3 (Environmental Measures Display) may be met by hosting the required data on a website accessible to occupants and in locations where the physical display would be located, placing signage indicating the website where the data may be accessed. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1 description, change “Monitors measure 2 of the following pollutants in a regularly occupied space…” to “Monitors measure 2 of the following pollutants in a regularly occupied or common space…” |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add on-site spot checks as required verification. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 For Feature 19, Part 1, a dedicated outdoor terrace can be provided. The terrace must satisfy the following requirements:a. Must be directly accessible from the tenant spaceb. Must be able to accommodate a minimum of 15% of the total regular project occupantsc. Must be adequately shaded to allow occupants to perform their work without significant glared. Feature 19, Part 2 and Part 3 must be addressed |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 17 Jan, 2017 To fulfill Feature 19, Part 1, projects may provide operable windows to 95% of the regularly occupied spaces in the office, provided that regularly occupied spaces, which do not have windows, have larger doorways to allow fresh air in, when open. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “Every regularly occupied space has operable windows that provide access to fresh air…” to “Every regularly occupied space has operable windows that provide access to outdoor air…” |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Architect Letter of Assurance as required documentation, remove annotated architectural drawing. |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add policy document as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Replace “One of the following is met for projects implementing a displacement ventilation system for heading and/or cooling:” with “Projects implement a displacement ventilation system for heating and/or cooling in which one of the following is met:” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 When desk bins are used to comply with Feature 22, Part 1, Requirement b, waste must be emptied at least once per day. Bins must be lined with appropriate liners (e.g. biodegradable liners for the compost bin) that will sufficiently retain all waste and waste residue. Bins must be wiped to remove waste residue when present or at least weekly. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Inspections". Add: "Visual inspections during performance verification" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 06 May, 2016 Change Part 1 verification type from Visual Inspection to Operations Schedule and Spot Check. |
06 May, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 Inquiry: For Part 1b, our garbage cans are integrated into casework. The casework has a 6 inch opening at the top for users to insert waste. The garbage is collected from the garbage cans daily to minimize the time that waste remains in the garbage cans. Will this design meet the requirements of Part 1b?Ruling: No, the design as described is not approved. The openings are large enough to allow pests to gain access to the garbage and allow for discarded trash to fall outside the garbage receptacle within the casework. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In introduction language, remove "and furniture be covered in washable covers" from the last sentence in the second paragraph. The last sentence becomes: "To minimize allergenic pests, this feature requires that pest inspections be conducted regularly and food be stored and sealed." |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 The following equivalencies have been approved for Feature 24 Part 4:1. Non-road diesel engine vehicles - Euro Stage IIIA, US Tier 3 and 2, Japan MoE standards.2. On road diesel engine vehicles - Euro V (2012) standard.It should be noted that Euro Stage IIIA, US Tier 3 and 2, Japan MoE and Euro V (2012) standard's allowable emission levels exceed those required in US Tier 4 and US EPA 2007. However, Euro Stage IIIA, US Tier 3 and 2, Japan MoE and Euro V are currently deemed best in class within Hong Kong at this time.It should be noted that Euro Stage IIIA, US Tier 3 and 2, Japan MoE and Euro V (2012) standard's allowable emission levels exceed those required in US Tier 4 and US EPA 2007. However, Euro Stage IIIA, US Tier 3 and 2, Japan MoE and Euro V are currently deemed best in class within Hong Kong at this time. |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 The following European local emission standards have been approved as an acceptable equivalent for Feature 24, Part 4:1. European Stage IV standard for non-road diesel engine vehicles or the use of non-road diesel engine vehicles equipped with diesel particulate filters (DPF).2. Euro VI emission standards for on-road engine vehicles or the use of on-road diesel engine vehicles equipped with diesel particulate filters (DPF). |
20 Mar, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 17 Jan, 2017 Projects that wish to include a gas range within the project scope must provide range hoods with increased exhaust efficiency in order to exhaust combustion byproducts. The range hood must provide at least 100 cubic feet per minute of exhaust air for every 10,000 BTU’s of burner output. If the burner output is unknown or cannot be guaranteed, then the range hood should provide a minimum of 600 cubic feet per minute of exhaust air. In addition, the range hood shall be exhausted directly to the outdoors. |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The following China local standards have been approved as an acceptable alternative for F24, Part 4:1. China local standard GB20891-2014 for non-road diesel engine vehicles2. China local standard GB17691-2005 for passenger vehicles and heavy duty trucksNote that that NOx limits in the China standards are higher then US EPA limits. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "(Please refer to Table A3 for additional details.)" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 To the last line of the first paragraph of the feature description, add: "All parts of this feature only apply to materials installed inside the weather proofing membrane of a project. (Please refer to Table A3 for additional details)" |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation. |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letters of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "At least one of the following requirements is met". Add: "At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) meet one or more of the following requirements" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "The project completes all Imperatives in the Materials Petal under the Living Building Challenge 3.0". Add: "Have a Declare: Living Building Challenge Red List Free, Declare: Living Building Challenge Compliant, or Living Product Challenge label" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) are Cradle to Cradle™ Material Health Certified with a V2 Gold or Platinum or V3 Bronze, Silver, Gold or Platinum Material Health Score". Add: "Have a Cradle to Cradle™ Material Health Certified with a V2 Gold or Platinum or V3 Bronze, Silver, Gold or Platinum Material Health Score." |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) have no GreenScreen® Benchmark 1, List Translator 1 or List Translator Possible 1 substances over 1,000 ppm, as verified by a qualified Ph.D. toxicologist or Certified Industrial Hygienist". Add: "Have no GreenScreen® Benchmark 1, List Translator 1 or List Translator Possible 1 substances over 1,000 ppm, as verified by a qualified Ph.D. toxicologist or Certified Industrial Hygienist" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) meet some combination of the certifications described in requirements b and c". |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letter of Assurance as required documentation, add Owner Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "that has an output of at least 4 mW/cm²" after "UV cleaning device" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add annotated architectural drawing or operations schedule as required documentation, remove architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Free of sharp internal angles, corners and crevices". Add: "Free of crevices and other hard-to-reach places" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add on-site spot checks as required verification. |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letters of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 Remove Part 1b. Update part lettering by changing “c. Mops do not have to be wrung by hand.” to “b. Mops do not have to be wrung by hand”, and changing "d. Vacuum cleaners contain filters with a HEPA rating." to "c. Vacuum cleaners contain filters with a HEPA rating." |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1, change “Turbidity of the water sample is less than 0.3 NTU” to “Turbidity of the water sample is less than 1.0 NTU”. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “All water being delivered to the project area for human consumption meets the following limits:” to “All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “All water being delivered to the project area for human consumption meets the following limits:” to “All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “All water being delivered to the project area for human consumption meets the following limits:” to “All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “All water being delivered to the project area for human consumption or showers/baths meets the following limits:” to “All water being delivered to the project area for human consumption (at least one water dispenser per project) and showers/baths meets the following limits: |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “All water being delivered to the project area for human consumption meets the following limits:” to “All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Interpretation |
Type: Interpretation
Inquiry: Feature 35 (Periodic Water Quality Testing) Part 1 (Quarterly Testing) requires the project team to test for metals/metalloids on a quarterly basis. How should this testing be conducted?Post Date: 24 Oct, 2016 Ruling: Testing procedures must follow the testing protocol outlined in the WELL Performance Verification Guidebook for Feature 31 (Inorganic Contaminants). If possible, sample points that have not been selected in the previous three quarters should be used. |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "or showers/baths" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "or showers/baths" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "or showers/baths" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In Part 2a, remove "Filter rated to remove suspended solids." And replace with "Filter rated to remove suspended solids with pore size 1.5 µm or less." |
10 Feb, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In Part 3b, remove "NSF filter rated to remove" and replace with "Filter rated by the NSF to remove" |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 24 Oct, 2016 For regularly occupied spaces that are not within 30 meters (100 feet) of a drinking water station, pitchers of filtered water and glasses may be provided that are monitored and refilled through the day. The Operations Schedule for the project must include information regarding the provision (location and quantities) of water and the monitoring and refilling of pitchers if this strategy is used. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "If solid foods are sold or distributed" before "on a daily basis". Add: "If foods are sold or provided" |
27 Apr, 2017 |