WELL Addenda
WELL ADDENDA
Review the complete list of addenda changes made to the WELL Building Standard.
Type | Description | Post Date | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In system diagram, add: "Integumentary" to list under diagram of body system |
20 Oct, 2017 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "4 pCi/L". Add: "0.148 Bq/L [4 pCi/L]" |
27 Apr, 2017 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Updated:
|
27 Apr, 2017 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 09 Feb, 2017 Projects located in areas where annual average ambient PM2.5 levels are 35 µg/m³ or higher may utilize one of the following alternative strategies to satisfy Part 2. |
09 Feb, 2017 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 For Part 1a, remove: "inside the building". Add: "inside the project" |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 For Part 4a, remove: "(Ventilation Rate Procedure or IAQ Procedure) for residential buildings of 3 or fewer floors". Add: "(or more recent version) for dwelling units" |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 For Part 4b, remove: "(Ventilation Rate Procedure or IAQ Procedure) for residential buildings of more than 3 floors above grade". Add: "for common areas and other spaces apart from dwelling units" |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 Remove: "c. Projects comply with all requirements set in the Natural Ventilation Procedure…the previous year." |
20 Oct, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 08 Aug, 2017 CISBE Guide A has been accepted as an alternative for the requirements in ASHRAE 62.1 2013 for Feature 3 Part 1 and Feature 15 Part 1. |
08 Aug, 2017 |
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Under "Air Feature 3 Ventilation effectiveness, Part 3", remove: "Testing and Balancing Report". Add: "MEP or Contractor" under "Letters of Assurance" |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 For Part 2b, add: "(measured at 1.2-1.8 m [4-6 ft] above the floor)" after "below 800 ppm" and add: "maximum" after "at" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 For Part 2a, add: "(measured at 1.2-1.8 m [4-6 ft] above the floor)" after "800 ppm" at the end of the sentence |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 EN 13779, section A. 15. 2, Table A.10 may be used to comply with Feature 03, Part 2. Note, projects must adhere to Indoor Air Category IDA 1 or 2. |
20 Mar, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 In Part 3a, change "After substantial completion and prior to occupancy, the HVAC system undergoes testing and balancing" to "After substantial completion and prior to occupancy, the HVAC system has (within the last 5 years), or is scheduled to, undergo testing and balancing." |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 CEN Standards EN 15251:2007 and EN 13779:2007 may be used in lieu of ASHRAE 62.1-2013 for Feature 03, Part 1. The requirements of CEN Standard EN 15251-2007 must be met AND the performance requirements of CEN Standard EN 13779:2007 related to ventilation and room conditioning systems must be met (excluding section 7.3, Thermal Environment; section 7.6, Acoustic Environment; section A.16; and section A.17). Projects must meet Category I or II as described in the standards. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 AS 1668.2 may be used in lieu of ASHRAE 62.1 for Feature 3, Part 1: Ventilation Design. Note that all projects that wish to comply with AS 1668.2 must assume a minimum density of 16 m² per person. |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 At the end of Part 1b, add "Quality Standards feature in the WELL Building Standard for at least 95% of all hours in the previous year." |
10 Feb, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 Under Part 2, after “For all spaces” insert the following: “46.5 m² [500 ft²] or larger” |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 Blue Angel is approved as an acceptable equivalent to the requirements of Feature 4 VOC Reduction Part 1 and 2. Note, projects must adhere to the minimum formaldehyde requirement specified in the CDPH Standard Method v1.1-2010 for VOC emissions. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 AgBB is approved as an acceptable equivalent to the requirements of Feature 4 VOC Reduction Part 1, 2, 3 and 5. Note, projects must adhere to the minimum formaldehyde requirement specified in the CDPH Standard Method v1.1-2010 for VOC emissions. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 OEKO-TEX is approved as an acceptable equivalent to the requirements of Feature 4 Part 4. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 GEV-EMICODE EC1 and EC1Plus is approved as an acceptable equivalent to the requirements of Parts 1, 2 and 3 of Feature 4 VOC Reduction Part 1, 2 and 3. Note, projects must adhere to the minimum formaldehyde requirement specified in the CDPH Standard Method v1.1-2010 for VOC emissions. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 M1 (ISO 16000) is approved as an acceptable equivalent to the requirements of Feature 4 VOC Reduction Part 1, 2, 3 and 5. Note, projects must adhere to the minimum formaldehyde requirement specified in CDPH Standard Method v1.1-2010 for VOC emissions. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 M1 (EN-717-1:2004) is approved as an acceptable equivalent to the requirements of Feature 4 VOC Reduction Part 5. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Nov, 2017 CRI Green Label Plus is approved as an acceptable equivalent to the requirements specified in the CDPH Standard Method v1.1-2010 for Feature 4 Part 2 and 3. |
02 Nov, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Oct, 2017 The REACH standard has not been accepted as an equivalent to the CDPH Standard Method v1.1-2010 guidelines for Feature 04 Part 5. Note that the VOC limit thresholds specified in CDPH Standard Method v1.1-2010 guidelines must be met. The VOC limit thresholds for Substances of Very High Concern (SVHC) listed in REACH are not acceptable. |
17 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 05 Oct, 2017 Conformance to the ANSI/BIFMA e3 standard by an accredited third-party product certification body is an acceptable alternative for the requirements for Feature 4, Part 5. |
05 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 05 Oct, 2017 EN 13964:2014 emission testing method has been accepted as an alternative for the requirements of Feature 4, Part 4 for suspended ceilings. Ceilings with heating or cooling properties and walls must meet limits set by the California Department of Public Health Standard Method v1.1-2010. Formaldehyde emission should be measured in accordance with EN 717-1:2004. |
05 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 04 Oct, 2017 SGS TVOC laboratory testing method has been accepted as an alternative equivalent to Feature 04 Part 4. Note, projects must adhere to the minimum VOC limit requirements of the CDPH Standard Method v1.1-2010 for VOC emissions. |
04 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 02 Oct, 2017 Global GreenTag has been approved as an acceptable equivalent to the requirements for Feature 04 Part 1, 2, 3, 4 and 5. |
02 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 21 Sep, 2017 The Australian Carpet Classification Scheme (ACCS) has been accepted as an equivalent for CDPH Standard Method v1.1 of Feature 4 Part 1. |
21 Sep, 2017 |
Equivalency |
Type: Equivalency
Post Date: 18 Sep, 2017 IS 101.2.2.1986 and IS 101.2.1.1988 are acceptable equivalent testing method standards in order to measure in accordance with the VOC content threshold limits specified in SCAQMD Rule 1168 for Part 2a. |
18 Sep, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Sep, 2017 IS 101.2.2.1986 and IS 101.2.1.1988 are acceptable equivalent testing method standards in order to measure in accordance with the VOC content threshold limits specified in SCAQMD Rule 1113 for Part 1a. |
17 Sep, 2017 |
Equivalency |
Type: Equivalency
Post Date: 21 Aug, 2017 Indoor Air Comfort Gold has been approved for Feature 04 - Part 1, 2, 3 and 4. However, indoor air comfort is not an accepted label for meeting WELL Feature 04 Part 1, 2, 3 and 4. |
21 Aug, 2017 |
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 For Part 2a, add: "for VOC content", after "South Coast Air Quality Management District (SCAQMD) Rule 1168" |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 26 Jul, 2017 BREEAM-NL New Construction 2014, Hea 09 - Volatile Organic Compounds, is an approved alternative to BREEAM UK New Construction 2014 Hea 02 - Indoor Air Quality to meet WELL Feature 04 Parts 1-3. |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 26 Jul, 2017 MAS Certified Green® has been accepted for Feature 04 Parts 1, 2, 3, 4, 5. MAS Certified Green® is also accepted for LEED v4 EQ Credit Low-Emitting Materials Third Party Certifications and Labels. It meets CDPH for emissions, CARB or SCAQMD for VOC content (wet-applied), and ANSI/BIFMA for furniture. |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 26 Jul, 2017 GUT has been accepted for Feature 04 Part 3. The GUT standard was created by the European carpet industry, and aims ""to improve continuously all environmental and consumer protection aspects throughout the life cycle of a textile floor covering (from production to installation, to use phase and recycling"". This standard is only applicable to Part 3, and thresholds are as follows: Termination criteria 3 days after loading: Desired values 28 days after loading: |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 26 Jul, 2017 VOC ETL class 2 and 3, VOC+ ETL Environmental and Formaldehyde-Free, has been accepted for Feature 04 Part 5. |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 26 Jul, 2017 Exemplary level emission criteria for BREEAM International New Construction 2016 scheme has been accepted as an equivalent standard to the California Department of Public Health (CDPH) Standard method v1.1-2010 as specified in Part 4a of this feature. The thresholds are as follows: |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jul, 2017 eco-INSTITUT-Label (2015 version) has been deemed acceptable for Feature 04 Part 1 - 4 with the following requirement: |
17 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "b. For furnishings, California Department of Public Health (CDPH) Standard Method v1.1-2010." |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "July 1, 2005 for VOC content". Add: "Volatile organic compound (VOC) limits correspond to an effective date of July 1, 2005 and rule amendment date of January 7, 2005." |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 GreenGuard Gold is accepted as an equivalent for Feature 4, Part 5 |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 Updated: LEED v4 EQc Low-emitting materials credit is deemed equivalent for Part 2. Please note that the project must adhere to the ""Additional VOC content requirements for wet-applied products"" section (found in LEED v4). Additionally, all newly applied adhesives and sealants must be in compliance. LEED v4 EQc Low-emitting materials credit is deemed equivalent for Part 3. Please note that the project must adhere to the ""General emissions evaluation"" section (found in LEED v4). Additionally, all newly installed flooring must be in compliance. LEED v4 EQc Low-emitting materials credit is deemed equivalent for Part 4. Please note that the project must adhere to the ""General emissions evaluation"" section (found in LEED v4). Additionally, all newly installed insulation must be in compliance. LEED v4 EQc Low-emitting material credit is deemed equivalent for Part 5. Please note that the project must adhere to the ""Furniture evaluation"" section (found in LEED v4). Additionally, 95% (by cost) of all newly purchased furniture and furnishing must be in compliance. Note BREEAM equivalency is only applicable for Feature 4 Parts 1-3. |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 ORIGINAL RULING (10/24/2016): UPDATED RULING (1/11/2017): |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 Indoor Advantage Gold has been approved as an acceptable alternative for F04, Parts 1, 2, 4, and 5. |
17 Jan, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 17 Jan, 2017 For Feature 4, Part 5, as an alternative to the formaldehyde emissions thresholds cited in ANSI/BIFMA e3-2011 7.6.2, projects may use certain approved thresholds. For systems furniture laminates: CDPH Standard Method v1.1-2010 limits (9 ug/m3) may be used. For furniture substrates: CARB Phase II limits (50 ppb for hardwood plywood with veneer core, 50 ppb for hardwood plywood with composite core, 90 ppb for particleboard, 110 ppb for medium density fiberboard, and 113 ppb for thin medium density fiberboard) may be used. Additionally, note that the project will still be required to demonstrate Feature 01: Air Quality Standards. |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 CalGreen 2013 Title 24, Part 11, California Green Building code has been approved as an equivalent for F04, Parts 1 and 2. For Part 3, projects are required to meet 100% of the resilient flooring requirements according to CalGreen 2013 Title 24 in order to fully comply with WELL requirements. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 In Parts 3, 4 and 5 of this Feature, change 'VOC content' to 'VOC emissions' |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 AFRDI Green Tick Furniture is compliant with Feature 4, Part 5. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 Green Star Credit 13: Indoor Pollutants is considered partially equivalent to WELL Feature 04: VOC reduction. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 Floorscore has been approved as an equivalent standard F04, Parts 2 and 3. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 Indoor Advantage Gold is accepted as an equivalent for F04, Parts 1, 2, 4, and 5. |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 Field and Laboratory Emission Cell (FLEC) emissions testing is approved as an emissions testing methodology ONLY for furniture and furnishings that are made up of a uniform material and have flat testing surfaces on which the FLEC emissions testing methodology may be applied. For example, flat surfaced cabinetry that is made up of a uniform material may be tested using this methodology. However, chairs that are made from a variety of materials that lack flat surfaces may not be tested using this methodology. The emissions test must be administered by a third party investigator with no affiliation with the project. The associated costs are the responsibility of the project team. Additional tests performed in accordance with ISO 16000 methodology must be performed for total aldehydes and 4-Phenylcyclohexane and must meet the thresholds specified in the WELL Building Standard. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change “The VOC content of all newly installed thermal and acoustic insulation in ceilings and walls…” to “The VOC content of all newly installed thermal and acoustic insulation inside the waterproofing membrane…” |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 Under Part 1c, delete "VOC control" and replace with "VOC content". |
10 Feb, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 Under Part 2c, delete "VOC control" and replace with "VOC content". |
10 Feb, 2016 |
Interpretation |
Type: Interpretation
Inquiry: Feature 4 Parts 1 through 5 apply to newly applied/installed/purchased products and materials. What products and materials are considered to be ‘new’?Post Date: 10 Feb, 2016 Ruling: Products or materials applied or installed within a timeframe of, at a minimum, one year prior to the WELL project registration are considered to be 'new.' UPDATED RULING. Post Date 1/11/2017. Ruling: Products or materials applied or installed within a timeframe of, at a minimum, one year prior to the WELL Performance Verification are considered to be 'new.' |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letters of Assurance as required documentation. |
10 Feb, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 20 Oct, 2017 The level© certification program may be used in lieu of ANSI/BIFMA e3-2011 Furniture Sustainability Standard sections 7.6.1 and 7.6.2, tested in accordance with ANSI/BIFMA Standard Method M7.1-2011. |
20 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Oct, 2017 Indoor Air Comfort Gold has been accepted as an alternative for the requirements of Feature 04 Parts 1, 2, 3, and 4. However, Indoor Air Comfort is not an accepted label for meeting the requirements of Feature 04 Parts 1, 2, 3, and 4. |
20 Oct, 2017 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Rack space and fan capacity is in place for future carbon filters or combination particle/carbon filters." Add: "Rack space is available and rack location identified for future implementation of carbon filters or combination particle/carbon filters." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects registered as New and Existing Interiors that can demonstrate that aspects of the base building design is outside of their control are not required to achieve Feature 05, Part 1: Filter Accommodation. |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 24 Oct, 2016 Projects unable to provide additional space for carbon filters may instead educate future tenants on their ability to buy and install stand-alone air purifiers with carbon filters. The project team must provide a letter signed by the project owner to confirm that if required for WELL certification in the future, the project owner will buy and install the air purifiers with filters on behalf of the tenant. It must be demonstrated that adequate wall space is accommodated to install wall-mounted air purifiers. The WELL Assessor will confirm the available wall space and examine a copy of all the information given to tenants during the project’s Performance Verification. |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 Add "or combination particle/carbon filters." to the end of Part 1a. Part 1a now reads "Rack space and fan capacity is in place for future carbon filters or combination particle/carbon filters." |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 Change Part 1b from "The system is able to accommodate additional filters" to "The mechanical system is sized to accommodate the additional filters." |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 Class F 7 (or higher) media filters are an acceptable equivalent to MERV 13 (or higher) media filters. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 24 Oct, 2016 In a project with a split-system air conditioning unit that does not allow for accommodating MERV 13 filters, the following measures may be implemented as an alternative. For Parts 1 and 2a of this feature, a standalone air purifier with carbon filter and HEPA filter performing equivalent to MERV 17-20 may be used in accordance with manufacturer’s guidelines. Installation of the HEPA filters may not be conditional based on the criteria in Part 2b. A sufficient quantity of stand-alone air purifiers and carbon filters and HEPA filters must be provided in accordance with the manufacturers recommended area coverage. Provide a policy document to confirm Part 3 of this Feature, and a policy document that confirms that the project owner will maintain and replace the filters and filter units located within the project as per manufacturer specifications. |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 In lieu of installing rack space for future carbon filters, an execution plan for future modifications to the HVAC system to create rack space for carbon filters may be provided in the event that the installation of carbon filters is a requirement of the WELL Building Standard in the future. To follow this approach, it must be confirmed that the system would be able to physically accept carbon filters should the necessary rack space be created, the plan must identify the cost estimates of renovating the HVAC system to include the necessary rack space to confirm that it is considered a capital improvement item, and the owner must commit to making the upgrades should the WELL Building Standard require carbon filters in a future recertification of the project. |
06 May, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 Multifamily Residential projects may use wall-mounted HEPA filters to meet the requirements of Feature 5 Parts 1 and 2, provided the project contains a sufficient quantity of wall mounted HEPA filters in accordance with the manufacturer’s recommended area coverage. In addition, a policy document must be provided confirming Part 3 of the Feature and that the Owner will maintain the filters for the units that are located in both common and private areas. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 17 Jan, 2017 As an alternative to the quarterly inspection of cooling coils required in Feature 6, Part 1b, projects may sample 25% of the project’s cooling coils per quarter (representative of all building orientations and equal to 100% of cooling coils per year) through either visual inspection or performance inspection tests. Policy documentation must be provided that includes a detailed description of the inspection protocols for cooling coils and drain pans, and confirming that cleaning will be provided if mold is found before the annual inspection. The inspection and analyses must be performed in accordance with ISO 16000-18 and ISO 16000-17. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add annotated operations schedule OR MEP drawing as required documentation, remove MEP Letter of Assurance, remove on-site spot checks. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "newly installed" after "all" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "occurring within one year prior to Performance Verification" after "building construction" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "occurring within one year prior to Performance Verification" after "during construction" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "occurring within one year prior to Performance Verification" after "building construction" |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 Green Star Credit 7: Construction Environmental Management, and Credit 9: Indoor Air Quality are considered partially equivalent to WELL Feature 07: Construction Pollution Management. Compliance with the Green Star credit is sufficient to comply with Parts 1 and 2 of the WELL Feature. Note that projects will still need to comply with Parts 3 and 4 of Feature 7 in order to fully comply with the Feature. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Remove Parts 3b and 3c. |
06 May, 2016 |
Interpretation |
Type: Interpretation
Inquiry: My project is an existing project; does Feature 7 apply to my project?Post Date: 06 May, 2016 Ruling: For existing projects, it must be demonstrated that the requirements of Feature 7 were met for all construction/renovation/alteration activity that took place during the process of readying the project for WELL certification and all construction/renovation/alteration activity that occurred within 1 year prior to the WELL project registration. If no such activity took place within 1 year prior to the WELL project registration, the feature requirements are met. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change title of Part 3 from "VOC Absorption Management" to "Moisture Absorption Management" |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 3, change "To prevent building materials from absorbing and later releasing VOCs emitted by other (source) materials during construction, the following requirements are met: to "To prevent building materials from absorbing water or moisture during construction, the following requirements are met:" |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 3a, change “A secure area is designated to store and protect…” to “A separate area is designated to store and protect…”. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 For Part 1b, add: "(sum of indoor and outdoor length)" after "primary direction of travel" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 For Part 1c, add: "(sum of indoor and outdoor length)" after "primary direction of travel" |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Permanent" from title of Part name. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 For Part 1a, add: "(sum of indoor and outdoor length)" after "primary direction of travel" |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 24 Oct, 2016 For projects that have an entryway walk off system that is less than 10 feet in length, but no smaller than 9’6’’, temporary rollout mats may be used during potential inclement weather (i.e. a 30% chance or higher) to bring the walk-off system up to 10 feet in length. In addition, projects must commit to cleaning the entrance/lobby multiple times daily, and demonstrate this through a cleaning plan. Provide the cleaning plan as well as a narrative detailing the project policy regarding rollout mats and inclement weather. |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 24 Oct, 2016 Where projects are restricted from using an entry vestibule or revolving door (for e.g. projects in the Philippines following the National Building Code, which prohibits revolving doors or vestibules for designated exits), they may use a permanent entryway system 3 meters long, and an air curtain to create an air seal. There are several specifications for this path: Projects must also provide indoor pressure sensor readings from one day. This should include exhaust and supply sequences. Projects should also provide mechanical drawings of the project space and manufacturer documentation of the air curtain equipment. |
24 Oct, 2016 |