Posted on: 10 Feb, 2016
Amendment: Under Part 1c, delete "VOC control" and replace with "VOC content".
|
Posted on: 10 Feb, 2016
Amendment: Under Part 2c, delete "VOC control" and replace with "VOC content".
|
Posted on: 10 Feb, 2016
Interpretation:
Feature 4 Parts 1 through 5 apply to newly applied/installed/purchased products and materials. What products and materials are considered to be ‘new’?
Ruling: Products or materials applied or installed within a timeframe of, at a minimum, one year prior to the WELL project registration are considered to be 'new.'
UPDATED RULING. Post Date 1/11/2017.
Ruling: Products or materials applied or installed within a timeframe of, at a minimum, one year prior to the WELL Performance Verification are considered to be 'new.' |