WELL Addenda
WELL Addenda
Type | Description | Post Date |
---|---|---|
Verification type |
Add Contractor Letters of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Remove Part 1b. Update part lettering by changing "c. Mops do not have to be wrung by hand." to "b. Mops do not have to be wrung by hand", and changing "d. Vacuum cleaners contain filters with a HEPA rating." to "c. Vacuum cleaners contain filters with a HEPA rating." |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
In Part 1, change "Turbidity of the water sample is less than 0.3 NTU" to "Turbidity of the water sample is less than 1.0 NTU". |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "All water being delivered to the project area for human consumption meets the following limits:" to "All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "All water being delivered to the project area for human consumption meets the following limits:" to "All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "All water being delivered to the project area for human consumption meets the following limits:" to "All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "All water being delivered to the project area for human consumption or showers/baths meets the following limits:" to "All water being delivered to the project area for human consumption (at least one water dispenser per project) and showers/baths meets the following limits: |
06 May, 2016 |
Correction |
Change "All water being delivered to the project area for human consumption meets the following limits:" to "All water being delivered to the project area for human consumption (at least one water dispenser per project) meets the following limits: |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Interpretation |
Inquiry: Feature 35 (Periodic Water Quality Testing) Part 1 (Quarterly Testing) requires the project team to test for metals/metalloids on a quarterly basis. How should this testing be conducted? Ruling: Testing procedures must follow the testing protocol outlined in the WELL Performance Verification Guidebook for Feature 31 (Inorganic Contaminants). If possible, sample points that have not been selected in the previous three quarters should be used. |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
In Part 2a, remove "Filter rated to remove suspended solids." And replace with "Filter rated to remove suspended solids with pore size 1.5 µm or less." |
10 Feb, 2016 |
Correction |
In Part 3b, remove "NSF filter rated to remove" and replace with "Filter rated by the NSF to remove" |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
For regularly occupied spaces that are not within 30 meters (100 feet) of a drinking water station, pitchers of filtered water and glasses may be provided that are monitored and refilled through the day. The Operations Schedule for the project must include information regarding the provision (location and quantities) of water and the monitoring and refilling of pitchers if this strategy is used. |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
The following strategy may be used to meet the requirements of Part 1d (In any foods where a grain flour is the primary ingredient by weight, a whole grain must be the primary ingredient): |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Equivalency |
The EU Regulation No 1169/2011 is an acceptable alternative to the requirements of Feature 40. Note that projects must still submit all applicable documentation to comply with these Features, and will also be subject to a spot check or visual inspection during the Performance Verification to verify compliance. |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Add Owner Letter of Assurance as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Equivalency |
The EU Regulation No 1169/2011 may be used to comply with the requirements of Feature 43 regarding labeling for artificial colors, flavors and sweeteners. Projects will need to label the remaining artificial substances listed in the requirements of Feature 43. Note that projects must still submit all applicable documentation to comply with these Features, and will also be subject to a spot check or visual inspection during the Performance Verification to verify compliance. |
24 Oct, 2016 |
Alternative Adherence Path |
For projects located in India, the requirements for Feature 43 may be met by providing labeling for all high-shelf life packaged foods in addition to freshly prepared food items offered on-site. Foods must be labeled with the additives outlined by the Food Safety and Standards Authority of India (FSSAI). Up to 30% of the low-shelf life packages goods prepared off site may be exempted from artificial substance labeling, but must include clear signage that they have not been evaluated for artificial ingredients or food additives. The latest version of the FSSAI regulation must be made available to building users upon request. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Correction |
Under 1b, the reference to the FDA is now removed. 1b now reads "Macronutrient (total protein, total fat and total carbohydrate) in weight and as a percent of estimated daily requirements (Daily Values)." |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Equivalency |
The EU Regulation No 1169/2011 is an acceptable alternative to the requirements of Feature 44. Note that projects must still submit all applicable documentation to comply with these Features, and will also be subject to a spot check or visual inspection during the Performance Verification to verify compliance. |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "All produce sold or distributed on the premises on a daily basis by (or under contract with) the project owner meets the following criteria:" to "Produce is sold or distributed on the premises on a daily basis by (or under contract with) the project owner and it meets the following criteria:" |
06 May, 2016 |
Correction |
Change "All meat egg and dairy products sold or distributed on the premises on a daily basis by (or under contract with) the project owner meet the following criteria" to "If meat, egg or dairy products are sold or distributed on the premises on a daily basis by (or under contract with) the project owner, they meet the following criteria" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Add Owner Letters of Assurance as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
In Part 2a, change "Refrigerator, microwave and sink" to "Refrigerator, device for reheating food (such as microwave or toaster oven) and sink" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
For Feature 53, Part 1 add Policy Document as required documentation, along with Architect Letter of Assurance and Spot Measurement. This policy document should be used to confirm the requirements of Part 1c of this feature. |
24 Oct, 2016 |
Verification type |
Add professional narrative as required documentation, remove Architect Letter of Assurance, remove on-site spot measurements. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
In Part 1b, change "For all workstations, electric lights provide" to "For all workstations, electric lights (which may include task lighting) provide" |
06 May, 2016 |
Correction |
In Part 1b, Change first part of first sentence from "Electric lights provide" to "For all workstations, electric lights provide" |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
The Unified Glare Rating (UGR) value may be used in lieu of the requirements of Feature 55 as written. Specifically, the recommendations in EN 12464-1 may be used in place of Part 1. For Part 2, workstations should have a UGR of 19 (or less). |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "At workstations and desks, the following requirement is met:" to "At workstations, desks and other seating areas, the following requirement is met:" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
The following glare control strategies may be used in lieu of glare requirements for atriums. Project teams may submit a plan or narrative detailing the use of a combination of the following: glare reducing film that has a solar transmittance of 10% or less, space planning to ensure workstations are set back from atrium spaces by at least 7 feet, and building orientation to reduce solar glare. Project teams must demonstrate that occupant comfort is not impacted. |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Equivalency |
Reduction is an accepted equivalent for Feature 56. Compliance with the Green Star Credit requirements is sufficient to comply with the WELL feature. |
24 Oct, 2016 |
Correction |
In Part 2a, change "Interior window shading or blinds that are controllable by the occupants or set on a timer" to "Interior window shading or blinds that are controllable by the occupants or set to automatically prevent glare." |
06 May, 2016 |
Correction |
In Part 2b, change "External shading systems that are controllable by the occupants or set on a timer." To "External shading systems that are set to automatically prevent glare." |
06 May, 2016 |
Correction |
Change "At least one of the following is present for all glazing less than 2.1m [7 ft] above the floor:" to "At least one of the following is present for all glazing less than 2.1m [7 ft] above the floor in regularly occupied spaces:" |
06 May, 2016 |
Correction |
In Part 1a, change "Interior window shading or blinds that are controllable by the occupants or set on a timer" to "Interior window shading or blinds that are controllable by the occupants or set to automatically prevent glare." |
06 May, 2016 |
Correction |
In Part 1b, change "External shading systems that are controllable by the occupants or set on a timer" to "External shading systems that are set to automatically prevent glare" |
06 May, 2016 |
Correction |
Change "At least one of the following is required for all glazing greater than 2.1 m (7 ft) above the floor:" to "At least one of the following is required for all glazing greater than 2.1 m (7 ft) above the floor in regularly occupied spaces:" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Monitors with adjustable monitor arms that allow the occupant to move the computer screens to face within a 20 degree perpendicular to the plane of the nearest window may be used to meet the requirements of Part 1a (Glare Avoidance). |
06 May, 2016 |
Alternative Adherence Path |
Inquiry: Can "free address" workstations, allowing occupants to change workstations to avoid glare, be used to meet the feature requirements? Ruling: No, free address workstations may not be used to meet the feature requirements. |
06 May, 2016 |
Correction |
In Part 1a, change the first part of the first sentence from "To minimize glare cause by incoming sunlight, all computer screens for at desks" to "To minimize glare caused by incoming sunlight, all computer screens at desks" |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
In Part 1a, change "Shading devices that automatically engage when light sensors indicate that sunlight could contribute to glare at workstations" to "Shading devices that automatically engage when light sensors indicate that sunlight could contribute to glare at workstations and other seating areas." |
06 May, 2016 |
Verification type |
Add MEP Letters of Assurance as required documentation, remove Architect Letters of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Inquiry: Can a daylighting analysis confirming that at least 90% of regularly occupied spaces have sufficient daylight illumination levels (at least 30 footcandles) and that 100% of spaces have access to quality outdoor views be used to meet the feature requirements? Ruling: No, a daylighting simulation combined with access to quality views may not be utilized to meet the feature requirements. The intent of Feature 61 is to include proximity to windows, outdoor views, and daylight in indoor spaces. |
06 May, 2016 |
Correction |
In Part 2a, change "75% of all desks or regularly occupied seats" to "75% of all workstations" |
06 May, 2016 |
Correction |
In Part 2b, change "95% of all desks or regularly occupied seats" to "95% of all workstations" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
The Green Star Daylight criterion is deemed partially equivalent to the requirements of Feature 62. Compliance with the Green Star credit is sufficient to comply with Part 1a of the WELL feature. |
24 Oct, 2016 |
Alternative Adherence Path |
As an alternative to a lighting simulation to determine the sDA of the space, project teams may use the LEED v4 BD+C EQ Daylight Credit requirements to fulfil the requirement. The provided lighting analysis document must be updated to demonstrate that 90% of the regularly occupied floor area meets the requirements (i.e. 2 points under LEED v4 BD+C EQ Daylight credit). |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Inquiry: Can an automatic shading system that draws shades when sensors indicate that daylight can contribute to glare at workstations be used in lieu of meeting the feature requirements? Ruling: No, the installation of automated shading devices alone does not meet the feature requirements, as this feature requires demonstration that as a result of the overall lighting design, the project is able to achieve the proper amount of daylighting. |
06 May, 2016 |
Verification type |
Add annotated modeling report as required documentation, remove annotated architectural drawing. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Correction |
Change "The following conditions are met:" to "The following conditions are met on façades along regularly occupied spaces:" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Correction |
Change the first line of Part 1 from "The following requirements are met for at least one common staircase:" to "In projects of 2 to 4 floors, at least one common staircase meets the following requirements:" |
24 Oct, 2016 |
Correction |
Change the first line of Part 3 from "Both common stairs and paths of frequent travel display elements of aesthetic appeal in incorporating at least 2 of the following:" to "In projects of 2 to 4 floors, common stairs, entryways and corridors display elements of aesthetic appeal by incorporating at least 2 of the following:" |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Staircases located in residential units may be exempt from meeting the requirements of Part 2c (stair width set at a minimum of 1.4m [56 in] between handrails. |
06 May, 2016 |
Correction |
Change "The following requirements are met:" to "The following requirements are met for at least one common staircase:" |
06 May, 2016 |
Correction |
Change "In projects of 2 to 4 floors, at least one staircase meets the following requirements:" to "In projects of 2 to 4 floors, at least one common staircase meets the following requirements:" |
06 May, 2016 |
Correction |
Change "Both stairs and paths of frequent travel" to "Both common stairs and paths of frequent travel" |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Incentives of a $200 amount provided to employees for demonstration of independent regular exercise, healthy eating habits, biometric screenings or other independent activities to promote a healthy lifestyle may be used as one of the two required compliance strategies for Feature 65. |
24 Oct, 2016 |
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Alternative Adherence Path |
For Part 1 (Activity Incentive Programs), alternative monetary values may be accepted. For Part 1b, the owner must make available 50% of the cost of the average local (within 10 miles) gym membership. To comply with Part 1c, the owner must subsidize participation in up to two races, sports teams, or two group fitness activities. To comply with Part 1d, the owner must subsidize up to two training programs in professional gyms, studios, or other fitness facilities. Alternative monetary values that are based on the wages or salaries of the occupants are not approved. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Under Appendix D, change the feature type for Parts 1 and 2 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Add annotated map as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |