WELL Addenda
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 (Approved) |
20 Mar, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) The requirements of CEN Standard EN 15251-2007 must be met AND the performance requirements of CEN Standard EN 13779:2007 related to ventilation and room conditioning systems must be met (excluding section 7.3, Thermal Environment; section 7.6, Acoustic Environment; section A.16; and section A.17). Projects must meet Category I and II as described in the standards. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 (Approved) |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 (Approved) |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 Updated (Approved): LEED v4 EQc Low-emitting materials credit is deemed equivalent for Part 2. Please note that the project must adhere to the "Additional VOC content requirements for wet-applied products" section (found in LEED v4). Additionally, all newly applied adhesives and sealants must be in compliance. LEED v4 EQc Low-emitting materials credit is deemed equivalent for Part 3. Please note that the project must adhere to the "General emissions evaluation" section (found in LEED v4). Additionally, all newly installed flooring must be in compliance. LEED v4 EQc Low-emitting materials credit is deemed equivalent for Part 4. Please note that the project must adhere to the "General emissions evaluation" section (found in LEED v4). Additionally, all newly installed insulation must be in compliance. LEED v4 EQc Low-emitting material credit is deemed equivalent for Part 5. Please note that the project must adhere to the "Furniture evaluation" section (found in LEED v4). Additionally, 95% (by cost) of all newly purchased furniture and furnishing must be in compliance. Note BREEAM equivalency is only applicable for Feature 4 Parts 1-3. |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 ORIGINAL RULING (10/24/2016): UPDATED RULING (1/11/2017): |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) LEED is deemed an equivalent standard for Part 2. Please note that the project must adhere to the "Additional VOC content requirements for wet-applied products" section (found in LEED v 4). Additionally, all newly applied adhesives and sealants must be in compliance. BREEAM is deemed an equivalent standard for Part 2. Please note the project must adhere to the Volatile organic compound (VOC) emission levels for products (found in Table 18 in the BREEAM UK New Construction 2014). Additionally, all newly applied adhesives and sealants must be in compliance.. LEED is deemed an equivalent standard for Part 3. Please note that the project must adhere to the "General emissions evaluation" section (found in LEED v 4). Additionally, all newly installed flooring must be in compliance. BREEAM is deemed an equivalent standard for Part 3. Please note the project must adhere to the Volatile organic compound (VOC) emission levels for products (found in Table 18 in the BREEAM UK New Construction 2014). Additionally, all newly installed flooring must be in compliance. LEED is deemed an equivalent standard for Part 4. Please note that the project must adhere to the "General emissions evaluation" section (found in LEED v 4). Additionally, all newly installed insulation must be in compliance. LEED is deemed an equivalent standard for Part 5. Please note that the project must adhere to the "Furniture evaluation" section (found in LEED v 4). Additionally, 95% (by cost) of all newly purchased furniture and furnishing must be in compliance. PLEASE NOTE: BREEAM equivalency for F04 Parts 1-3, only applies to projects that are not pursuing any BREEAM Certification. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 (Approved) |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 NUCOR has been deemed an acceptable standard to meet the requirements of Feature 11, Part 1. It should be noted that allowable lead content in NUCOR exceed the WELL Part 1b requirement. However, NUCOR is currently deemed best in class for sheet steel at this time. |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 CEN Standards EN 15251:2007 and EN 13779:2007 may be used in lieu of ASHRAE 62.1-2013 for Feature 15, Part 1. The project must meet Category I or II (described in Table 1) and must calculate the ventilation rate based on either of the below calculation methods, referenced in EN 15251: 2007, section B.1.3 ""Method based on ventilation rate per person or per m² floor area:"" Additionally, the requirements of CEN Standard EN 15251-2007 must be met and the performance requirements of CEN Standard EN 13779:2007 related to ventilation and room conditioning systems must be met (excluding section 7.3, Thermal Environment; section 7.6, Acoustic Environment; section A.16; and section A.17). |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 (Approved) |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 07 Apr, 2017 The following equivalencies have been approved for Feature 24 Part 4: |
07 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 (Approved) |
20 Mar, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved alternative) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) Green Star Credit 12.0: Glare Reduction is an accepted equivalent for Feature 56. Compliance with the Green Star Credit requirements is sufficient to comply with the WELL feature. |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as an AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 27 Apr, 2017 Previously published as AAP: |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 (Approved) |
20 Mar, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 (Approved.) |
20 Mar, 2017 |
Equivalency |
Type: Equivalency
Post Date: 20 Mar, 2017 (Approved.) |
20 Mar, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 06 May, 2016 (Approved.) |
06 May, 2016 |
Equivalency |
Type: Equivalency
Post Date: 06 May, 2016 (Approved.) |
06 May, 2016 |
Equivalency |
Type: Equivalency
Post Date: 06 May, 2016 (Approved.) 1. Signage adheres to the requirements of BS 8300: Design of buildings and their approaches to meet the needs of disables people, as referenced within the Part M Volume 2 Standard. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 (Approved) |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 (Approved) |
17 Jan, 2017 |