VERIFICATION METHODS
Parts of the WELL Building Standard™ fall into one of three categories with respect to the interventions necessary for their completion – design elements, protocols or performance standards. Design standards require that a specific technology or design strategy be used. Protocols are also prescriptive, but for building or company policies or schedules. Performance-based standards mandate environmental conditions and therefore are affected by both building design and operation. They are also technology- and practice-neutral, allowing flexibility in how a project meets acceptable quantified thresholds.
Air
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Standards for Volatile Substances |
Performance Test | ||
PART 2 (Performance) Standards for Particulate Matter and Inorganic Gases |
Performance Test | ||
PART 3 (Performance) Radon |
Performance Test | ||
PART 4 (Performance) Operational Kitchen Air Quality |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Indoor Smoking Ban |
Policy Document | ||
PART 2 (Protocol) Outdoor Smoking Ban |
Visual Inspection | ||
PART 3 (Protocol) Smoke-Free Campus |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Ventilation Design |
MEP | ||
PART 2 (Design) Demand Controlled Ventilation |
MEP | ||
PART 3 (Design) System Balancing |
MEP, Contractor | ||
PART 4 (Design) Ventilation Rates for Residences |
MEP |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Interior Paints and Coatings |
Architect & Contractor | ||
PART 2 (Design) Interior Adhesives and Sealants |
Architect & Contractor | ||
PART 3 (Design) Flooring |
Architect & Contractor | ||
PART 4 (Design) Insulation |
Architect & Contractor | ||
PART 5 (Design) Furniture and Furnishings |
Architect & Owner |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Filter Accommodation |
MEP | Spot Check | |
PART 2 (Design) Particle Filtration |
MEP | Spot Check | |
PART 3 (Design) Air Filtration Maintenance |
Operations Schedule |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Cooling Coil Mold Reduction |
MEP Drawing or Operations Schedule | ||
PART 2 (Performance) Mold Inspections |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Duct Protection |
Contractor | ||
PART 2 (Protocol) Filter Replacement |
Contractor | ||
PART 3 (Protocol) Moisture Absorption Management |
Contractor | ||
PART 4 (Protocol) Dust Containment and Removal |
Contractor |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Entryway Walk-Off Systems |
Visual Inspection | ||
PART 2 (Design) Entryway Air Seal |
Visual Inspection | ||
PART 3 (Design) Playing Field Staging Area |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Cleaning Plan for Occupied Spaces |
Operations Schedule |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Pesticide Use |
Operations Schedule |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Asbestos and Lead Restriction |
Architect & MEP | ||
PART 2 (Protocol) Lead Abatement |
Remediation Report | ||
PART 3 (Protocol) Asbestos Abatement |
Remediation Report | ||
PART 4 (Protocol) Polychlorinated Biphenyl Abatement |
Remediation Report | ||
PART 5 (Design) Mercury Limitation |
MEP | ||
PART 6 (Design) Playground Equipment Safety |
Remediation Report |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Exterior Liquid Water Management |
Professional Narrative | ||
PART 2 (Design) Interior Liquid Water Management |
Professional Narrative | ||
PART 3 (Design) Condensation Management |
Professional Narrative | ||
PART 4 (Design) Material Selection and Protection |
Professional Narrative |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Air Flush |
Contractor |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Air Leakage Testing |
Commissioning Report | ||
PART 2 (Design) Leak Tests for Residences |
Contractor | Leak Test Report |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Increased Outdoor Air Supply |
MEP |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Relative Humidity |
MEP | Spot Measurement | |
PART 2 (Design) Shower Moisture Barrier |
MEP | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Pollution Isolation and Exhaust |
Mechanical & Architectural Drawings | ||
PART 2 (Design) Exhaust Hood Design Guidelines |
MEP | Spot Check | |
PART 3 (Design) Makeup Air System Design |
Mechanical Drawing | ||
PART 4 (Design) Appliance Guidelines |
MEP | Spot Check | |
PART 5 (Design) Changing Rooms |
Mechanical Drawing |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Indoor Air Monitoring |
MEP | Spot Check | |
PART 2 (Protocol) Air Data Record Keeping and Response |
Policy Document | ||
PART 3 (Design) Environmental Measures Display |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Full Control |
Architect | Spot Check | |
PART 2 (Design) Outdoor Air Measurement |
Policy Document | ||
PART 3 (Design) Window Operation Management |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Dedicated Outdoor Air Systems |
MEP |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Displacement Ventilation Design and Application |
MEP | ||
PART 2 (Design) System Performance |
MEP |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Pest Reduction |
Policy Document | Spot Check | |
PART 2 (Performance) Pest Inspection |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Carbon Filtration |
MEP | Spot Check | |
PART 2 (Design) Air Sanitization |
MEP | Spot Check | |
PART 3 (Protocol) Air Quality Maintenance |
Operations Schedule |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Appliance and Heater Combustion Ban |
Owner | Spot Check | |
PART 2 (Design) Low-Emission Combustion Sources |
MEP | ||
PART 3 (Protocol) Engine Exhaust Reduction |
Visual Inspection | ||
PART 4 (Protocol) Construction Equipment |
Contractor |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Perfluorinated Compound Limitation |
Architect & Owner | ||
PART 2 (Design) Flame Retardant Limitation |
Architect & Contractor | ||
PART 3 (Design) Phthalate (Plasticizers) Limitation |
Architect & Contractor | ||
PART 4 (Design) Isocyanate-Based Polyurethane Limitation |
Architect & Contractor | ||
PART 5 (Design) Urea-Formaldehyde Restriction |
Architect & Contractor |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Precautionary Material Selection |
Architect, Contractor, Owner |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) High-Touch Surfaces |
Architectural Drawing or Operations Schedule | ||
PART 2 (Design) Changing Room Coating |
Architectural Drawing or Operations Schedule |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Material Properties |
Architect & Contractor | Spot Check | |
PART 2 (Design) Cleanability |
Architect & Contractor | Spot Check | |
PART 3 (Design) Cleanable Changing Rooms |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Equipment and Cleaning Agents |
Operations Schedule | ||
PART 2 (Design) Chemical Storage |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Advanced Cleaning Protocols |
Operations Schedule |
Water
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Sediment |
Performance Test | ||
PART 2 (Performance) Microorganisms |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Dissolved Metals |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Organic Pollutants |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Herbicides and Pesticides |
Performance Test | ||
PART 2 (Performance) Fertilizers |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Disinfectants |
Performance Test | ||
PART 2 (Performance) Disinfectant Byproducts |
Performance Test | ||
PART 3 (Performance) Fluoride |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Quarterly Testing |
Operations Schedule | ||
PART 2 (Protocol) Water Data Record Keeping and Response |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Organic Chemical Removal |
MEP | Spot Check | |
PART 2 (Design) Sediment Filter |
MEP | Spot Check | |
PART 3 (Design) Microbial Elimination |
MEP | Spot Check | |
PART 4 (Protocol) Water Quality Maintenance |
Operations Schedule | ||
PART 5 (Design) Legionella Control |
Professional Narrative |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Drinking Water Taste Properties |
Performance Test | ||
PART 2 (Design) Drinking Water Access |
Architect | Spot Check | |
PART 3 (Protocol) Water Dispenser Maintenance |
Operations Schedule | ||
PART 4 (Design) Outdoor Drinking Water Access |
Architect | Spot Check |
Nourishment
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Fruit and Vegetable Variety |
Policy Document | Spot Check | |
PART 2 (Protocol) Fruit and Vegetable Promotion |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Refined Ingredient Restrictions |
Policy Document | Spot Check | |
PART 2 (Protocol) Trans Fat Ban |
Policy Document | Spot Check | |
PART 3 (Performance) Fryer Oil |
Policy Document | ||
PART 4 (Design) Beverages for Early Education and Primary School |
Policy Document | Spot Check | |
PART 5 (Design) Beverages for Secondary School and Adult Education |
Policy Document | Spot Check | |
PART 6 (Design) Ingredients Restrictions for Schools |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Food Allergy Labeling |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Hand Washing Supplies |
Policy Document | Spot Check | |
PART 2 (Protocol) Contamination Reduction |
Visual Inspection | ||
PART 3 (Design) Sink Dimensions |
Architect | Spot Check | |
PART 4 (Design) Hand Washing Station Location |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Cold Storage |
Owner | Spot Check | |
PART 2 (Protocol) Food Preparation Separation |
Owner | Spot Check | |
PART 3 (Design) Residential Kitchen Sinks |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Artificial Substance Labeling |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Detailed Nutritional Information |
Visual Inspection | ||
PART 2 (Protocol) Healthy Cooking Guidelines |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Advertising and Environmental Cues |
Visual Inspection | ||
PART 2 (Protocol) Nutritional Messaging |
Visual Inspection | ||
PART 3 (Design) Healthy Choices Promotion |
Visual Inspection | ||
PART 4 (Design) Healthy Menu Design |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Cooking Material |
Policy Document | Spot Check | |
PART 2 (Protocol) Cutting Surfaces |
Policy Document | Spot Check | |
PART 3 (Protocol) Banned Plastics |
Policy Document | Spot Check | |
PART 4 (Protocol) Containers for Prepared Food |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Meal Sizes |
Policy Document | Spot Check | |
PART 2 (Protocol) Dishware |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Food Alternatives |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Sustainable Agriculture |
Policy Document | ||
PART 2 (Protocol) Humane Agriculture |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Storage Capacity |
Owner | Spot Check | |
PART 2 (Design) Temperature Control |
Owner | Spot Check | |
PART 3 (Protocol) Oil Storage |
Owner | Spot Check | |
PART 4 (Protocol) Kitchen Food Safety |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Gardening Space |
Owner | Spot Check | |
PART 2 (Design) Planting Support |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Eating Spaces |
Architectural Drawing | ||
PART 2 (Design) Break Area Furnishings |
Owner | Spot Check | |
PART 3 (Design) Lunch Breaks for Schools |
Owner |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Healthy Food Access |
Annotated Map | ||
PART 2 (Design) Communal Cooking Area |
Architectural Drawing |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Assessment Scorecard |
Owner | ||
PART 2 (Design) Healthy Food Convenience |
Visual Inspection | ||
PART 3 (Design) Seating Choice Variety |
Owner | Spot Check | |
PART 4 (Design) Quiet Dining Zone |
Owner | Spot Check |
Light
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Visual Acuity for Focus |
Architect | Policy Document | Spot Measurement |
PART 2 (Design) Brightness Management Strategies |
Professional Narrative | ||
PART 3 (Design) Commercial Kitchen Lighting |
Architect | Spot Measurement | |
PART 4 (Design) Visual Acuity in Living Environments |
Architect | Spot Measurement | |
PART 5 (Design) Visual Acuity for Learning |
Architect | Spot Measurement | |
PART 6 (Design) Visual Acuity for Dining |
Architect | Spot Measurement |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Melanopic Light Intensity for Work Areas |
Architect | Spot Measurement | |
PART 2 (Performance) Melanopic Light Intensity in Living Environments |
Architect | Spot Measurement | |
PART 3 (Performance) Melanopic Light Intensity in Breakrooms |
Architect | Spot Check | |
PART 4 (Design) Melanopic Light Intensity in Learning Areas |
Architect | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Luminaire Shielding |
Architect | ||
PART 2 (Design) Glare Minimization |
Architect |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) View Window Shading |
Architect | Spot Check | |
PART 2 (Design) Daylight Management |
Architect | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Glare Avoidance |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Color Rendering Index |
Architect |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Working and Learning Area Surface Reflectivity |
Architect | ||
PART 2 (Design) Bedroom Wall and Ceiling Lightness |
Architect | ||
PART 3 (Design) Living Space Wall and Ceiling Lightness |
Architect |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Automated Sunlight Control |
MEP | ||
PART 2 (Design) Responsive Light Control |
MEP |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Lease Depth |
Architectural Drawing | Spot Check | |
PART 2 (Design) Window Access |
Architectural Drawing | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Healthy Sunlight Exposure |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Window Sizes for Working and Learning Spaces |
Architectural Drawing | Spot Check | |
PART 2 (Design) Window Transmittance in Working and Learning Areas |
Architect | ||
PART 3 (Design) Uniform Color Transmittance |
Architect | ||
PART 4 (Design) Window Sizes for Living Spaces |
Architectural Drawing | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Window Light Elimination |
Visual Inspection | ||
PART 2 (Design) Electric Light Elimination |
Visual Inspection | ||
PART 3 (Design) Safe Nighttime Navigation Lighting |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Circadian Lighting |
Visual Inspection | ||
PART 2 (Design) Dawn Simulation |
Architect |
Fitness
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Stair Accessibility and Promotion |
Visual Inspection | ||
PART 2 (Design) Staircase Design |
Visual Inspection | ||
PART 3 (Design) Facilitative Aesthetics |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Activity Incentive Programs |
Policy Document | ||
PART 2 (Organizational Protocol) Sedentary Behavior Reduction |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Fitness Programs |
Policy Document | ||
PART 2 (Organizational Protocol) Fitness Education |
Policy Document | ||
PART 3 (Protocol) Physical Activity Breaks |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Pedestrian Amenities |
Owner | Spot Check | |
PART 2 (Design) Pedestrian Promotion |
Owner | Spot Check | |
PART 3 (Design) Neighborhood Connectivity |
Annotated Map |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Site Space Designation for Offices |
Architectural Drawing | ||
PART 2 (Design) External Exercise Spaces |
Annotated Map | ||
PART 3 (Design) Physical Activity Spaces for Schools |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Bicycle Storage and Support |
Owner | Spot Check | |
PART 2 (Design) Post Commute and Workout Facilities |
Architect | Spot Check | |
PART 3 (Design) Bicycle Storage Facilities for Schools |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Cardiorespiratory Exercise Equipment |
Owner | Spot Check | |
PART 2 (Design) Muscle-strengthening Exercise Equipment |
Owner | Spot Check | |
PART 3 (Design) Age-Appropriate Equipment |
Owner |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Active Workstations |
Owner | Spot Check | |
PART 2 (Design) Prevalent Standing Desks |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Sufficient Lighting |
Owner | Spot Check | |
PART 2 (Design) Sidewalks |
Owner | Spot Check | |
PART 3 (Design) Crosswalks |
Owner | Spot Check | |
PART 4 (Design) Safe Routes to School |
Owner | Spot Check | |
PART 5 (Design) Playgrounds |
Owner | Spot Check |
Comfort
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Accessibility and Usability |
Architect |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Visual Ergonomics |
Owner | Spot Check | |
PART 2 (Design) Desk Height Flexibility |
Owner | Spot Check | |
PART 3 (Design) Seat Flexibility |
Owner | Spot Check | |
PART 4 (Design) Standing Support |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Sound Pressure Level |
Performance Test | ||
PART 2 (Performance) Sound Pressure Level in Residences |
Performance Test | ||
PART 3 (Protocol) Acoustical Narrative |
Professional Narrative | ||
PART 4 (Design) Sound Pressure Level in Schools |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Acoustic Planning |
Professional Narrative | ||
PART 2 (Performance) Mechanical Equipment Sound Levels |
Performance Test | ||
PART 3 (Performance) Mechanical Equipment Sound Levels in Sensitive Rooms |
Performance Test | ||
PART 4 (Design) Best-Practice HVAC Installation |
Contractor | ||
PART 5 (Design) HVAC Sound Ratings |
MEP | ||
PART 6 (Performance) Noise Criteria in Schools |
Performance Test | ||
PART 7 (Design) Disruptive Music Limitation |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Ventilated Thermal Environment |
MEP | Spot Measurement | |
PART 2 (Design) Natural Thermal Adaptation |
MEP | Spot Measurement | |
PART 3 (Design) Thermal Comfort in the Kitchen |
MEP | Spot Measurement |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Source Separation |
Architectural Drawing |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Performance) Reverberation Time |
Performance Test | ||
PART 2 (Performance) Reverberation Time for Learning Spaces |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Sound Masking Use |
MEP | ||
PART 2 (Performance) Sound Masking Limits |
Performance Test |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Ceilings |
Architect | ||
PART 2 (Design) Vertical Surfaces |
Architect | ||
PART 3 (Design) School Ceilings |
Architect |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Wall Construction Specifications |
Architect | ||
PART 2 (Design) Doorway Specifications |
Architect & Contractor | ||
PART 3 (Design) Wall Construction Methodology |
Contractor | ||
PART 4 (Design) Noise Intrusion Mitigation |
Spot Check | ||
PART 5 (Design) Residential Acoustic Privacy |
Architect | ||
PART 6 (Design) Wall Construction Specifications for Schools |
Architect |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Free Address |
Policy Document | ||
PART 2 (Protocol) Personal Thermal Comfort Devices |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Lobbies and Other Common Spaces |
MEP | ||
PART 2 (Design) Offices and Other Regularly Occupied Spaces |
MEP |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Floor Construction |
Architect |
Mind
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) WELL Building Standard® Guide |
Visual Inspection | ||
PART 2 (Protocol) Health and Wellness Library |
Professional Narrative | Visual Inspection | |
PART 3 (Design) Health and Wellness Narrative |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Stakeholder Charrette |
Professional Narrative | ||
PART 2 (Protocol) Development Plan |
Professional Narrative | ||
PART 3 (Protocol) Stakeholder Orientation |
Professional Narrative |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Protocol) Occupant Survey Content |
Policy Document | ||
PART 2 (Protocol) Information Reporting |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Beauty and Mindful Design |
Professional Narrative |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Nature Incorporation |
Professional Narrative | ||
PART 2 (Design) Pattern Incorporation |
Professional Narrative | ||
PART 3 (Design) Nature Interaction |
Professional Narrative |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Stimuli Management |
Architect | Spot Check | |
PART 2 (Design) Privacy |
Architect | Spot Check | |
PART 3 (Design) Space Management |
Owner | Spot Check | |
PART 4 (Protocol) Workplace Sleep Support |
Owner | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Non-Workplace Sleep Support |
Policy Document | ||
PART 2 (Organizational Protocol) Delayed Start |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Travel Policy |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Health Benefits |
Policy Document | ||
PART 2 (Organizational Protocol) Community Immunity |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Parental Leave |
Policy Document | ||
PART 2 (Organizational Protocol) Employer Supported Child Care |
Policy Document | ||
PART 3 (Organizational Protocol) Family Support |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Sensors and Wearables |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Mind and Behavior Support |
Policy Document | ||
PART 2 (Organizational Protocol) Stress Management |
Policy Document | ||
PART 3 (Organizational Protocol) Mind and Behavior Support for Students |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Charitable Activities |
Policy Document | ||
PART 2 (Organizational Protocol) Charitable Contributions |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Material Information |
Architect, Contractor, Owner | ||
PART 2 (Design) Accessible Information |
Visual Inspection |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Organizational Protocol) Transparency Program Participation |
Policy Document | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Ceiling Height |
Architectural Drawing | Spot Check | |
PART 2 (Design) Artwork |
Professional Narrative | ||
PART 3 (Design) Spatial Familiarity |
Professional Narrative |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Outdoor Biophilia |
Owner | Spot Check | |
PART 2 (Design) Indoor Biophilia |
Architect | Spot Check | |
PART 3 (Design) Water Feature |
Architect | Spot Check |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Unit Allocation |
Policy Document | ||
PART 2 (Design) Housing Cost Limits |
Policy Document | ||
PART 3 (Protocol) Affordability Period |
Policy Document |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Design) Classroom Space Allocation |
Architect | ||
PART 2 (Design) Class Size Caps |
Architect |
Innovation
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Innovation) Innovation Proposal |
Innovation Proposal | ||
PART 2 (Innovation) Innovation Support |
Innovation Proposal |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Innovation) Innovation Proposal |
Innovation Proposal | ||
PART 2 (Innovation) Innovation Support |
Innovation Proposal |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Innovation) Innovation Proposal |
Innovation Proposal | ||
PART 2 (Innovation) Innovation Support |
Innovation Proposal |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Innovation) Innovation Proposal |
Innovation Proposal | ||
PART 2 (Innovation) Innovation Support |
Innovation Proposal |
Letters of Assurance | Annotated Documents | On-Site Assessment | |
---|---|---|---|
PART 1 (Innovation) Innovation Proposal |
Innovation Proposal | ||
PART 2 (Innovation) Innovation Support |
Innovation Proposal |