This is a legacy version of the WELL Building Standard. Please check the latest version here.

Air Leakage Testing - a

Requirement: 
a
Description: 

Envelope commissioning in accordance with ASHRAE Guideline 0-2005 and the National Institute of Building Sciences (NIBS) Guideline 3-2012 (for new construction or structural renovation).

Support Threshold: 

LEED v4 BD+C: Enhanced commissioning provides two options for the credit, one of which involves following commissioning processes for the building's thermal envelope in accordance with ASHRAE Guideline 0-2005 and NIBS Guideline 3-2012.

Part: 
Air Leakage Testing
RecDocTitile: 
LEED v4: Reference Guide for Building Design and Construction