WELL Addenda
WELL ADDENDA
Review the complete list of addenda changes made to the WELL Building Standard.
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 For kitchens that are no more than 3 m [10 ft] in any direction, the project team may use a ceiling height of 2.5 m [8.2 ft] in the kitchens. |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 For Feature 100, Part 3, the project team may include a seasonal water element in lieu of a perennial water element. For the remainder of the year, the element can be designed with appropriate vegetation, natural materials, or organic shapes, patterns and textures. The project team should also provide additional information regarding the element to visitors/occupants through an education display/placard located in the direct vicinity of the element. This display should be of sufficient size to include information such as the design concept or methodology, vegetation types, local context, etc. |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation, remove architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 For Part 1b, add: "to impact the occupants of the project or the general public in a positive manner" after "...WELL Building Standard" |
20 Oct, 2017 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Add new features 103 (Innovation Feature III), 104 (Innovation Feature IV), and 105 (Innovation Feature V). Feature language is identical to Features 101 and 102. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Add new features 103 (Innovation Feature III), 104 (Innovation Feature IV), and 105 (Innovation Feature V). Feature language is identical to Features 101 and 102. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Add new features 103 (Innovation Feature III), 104 (Innovation Feature IV), and 105 (Innovation Feature V). Feature language is identical to Features 101 and 102. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 01 May, 2019 The higher the IIC, the greater sound attenuation of impact sound. IIC measurements cover a frequency range of 100-3503150 Hz; the range corresponds to a general “thump” at the lower level, and a sharper “clack” at the higher end. |
01 May, 2019 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 For Part 1a, remove: "elementary, middle and high school". Add: "primary and secondary schools" |
07 Jun, 2018 |
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 In part title, remove: "for Elementary School" |
07 Jun, 2018 |
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 For Part 2a, remove: "Elementary school". Add: "Early education and primary school" |
07 Jun, 2018 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Remove: "7.6 m". Add: "2 m²" |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Remove: "5.5 m". Add: "1.5 m²" |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Remove: "13.7 m". Add: "4 m²" |
26 Jul, 2017 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 05 Feb, 2018 In part description, remove: "Early education, elementary, middle, and high school". Add: "Early education, primary and secondary school" |
05 Feb, 2018 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 For Verification Methods Matrix, Add: "Owner" to Letter of Assurance column |
26 Jul, 2017 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 For Citation 126, remove: "www.ies.org/PDF/MLO/MLO_FINAL_June2011.pdf". Add: "http://www.darksky.org/wp-content/uploads/bsk-pdf-manager/16_MLO_FINAL_J..." |
07 Jun, 2018 |