Posted on: 20 Oct, 2017
Amendment: For Part 3a, remove: "or by a U.S. EPA accredited company experienced in asbestos assessment". Add: "or" before "accredited asbestos consultant..."
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "carry out the following:". Add: "For" before "any projects undergoing...". Add "the below guidelines are applied and a policy put in place for future work:" after "PCBs"
|
Posted on: 20 Oct, 2017
Amendment: In feature background, remove: "(Please refer to Table A3 for additional details.)"
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "buildings". Add: "projects"
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "on buildings". Add: "of projects"
|
Posted on: 20 Oct, 2017
Amendment: In part description, add: ", demolition," after "For repair, renovation"
|
Posted on: 27 Apr, 2017
Amendment: Remove: "Not more than 100 ppm (by weight) added lead". Add: "Not more than a weighted average of 0.25% lead in wetted surfaces of pipes, pipe fittings, plumbing fittings, and fixtures, and 0.20% for solder or flux used in plumbing for water intended for human consumption"
|
Posted on: 27 Apr, 2017
Amendment: Add "c. Not more than 100 ppm (by weight) added lead in all other building materials."
|