Post Date: 09 Feb, 2017
Status: Approved
Projects located in areas where annual average ambient PM2.5 levels are 35 µg/m³ or higher may utilize one of the following alternative strategies to satisfy Part 2.- Replace the PM2.5 level in part 2b with 25 µg/m³. Projects using this option are limited in WELL Certification level to Gold, no matter how many optimizations are achieved.- Replace the PM2.5 level in part 2b and the PM10 level in part 2c with a level equal to 30% of the 24- or 48-hr average of ambient outdoor levels on the day(s) of Performance Verification. Projects using this option are limited in WELL Certification level to Silver, no matter how many optimizations are achieved.