WELL Addenda
WELL ADDENDA
Review the complete list of addenda changes made to the WELL Building Standard.
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Remove: "3,000 m³". Add "280 m³" |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1b, change “Open office spaces:” to “Open workspaces:” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 04 Dec, 2017 AS/NZS 2107:2016 has been accepted as an alternative to the sound masking level requirements in Feature 79 Part 2. Note that Private Office and Open Workspace sound masking levels must fall within the background noise criteria ranges in Table 1 of AS/NZS 2107:2016. This equivalency applies only to projects in Australia and New Zealand. |
04 Dec, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2a, change “Open office spaces:” to “Open workspaces:” |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add MEP Letter of Assurance as required documentation, remove Architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 For Part 1a and 1b, add: ", beams, joists" after "...lights, skylights, diffusers" |
07 Jun, 2018 |
Equivalency |
Type: Equivalency
Post Date: 16 Mar, 2018 Alpha W (αw) has been accepted as an equivalent to the Noise Reduction Coefficient (NRC) requirements of Feature 80 – Sound Reducing Surfaces, Parts 1-3. Note that Alpha W is, like NRC, a single number metric for sound absorption that ranges from 0.00 to 1.00 and represents the average absorption coefficient of a given material across 125 Hz to 4 kHz, while NRC is a metric based on absorptive coefficients of a given material across 250 Hz to 2 kHz. |
16 Mar, 2018 |
Amendment |
Type: Amendment
Post Date: 05 Feb, 2018 For Part 2, remove: "walls". Add: "vertical surfaces" |
05 Feb, 2018 |
Amendment |
Type: Amendment
Post Date: 24 Oct, 2016 For Part 2a, add "interior" in front of "surrounding walls." |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1a, change “Open office spaces” to “Open workspaces:” |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2b, change “Open office spaces:” to “Open workspaces:” |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 2c, change “Cubicle style offices:” to “Partitioned office spaces:” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 For Part 1b, remove: "NIC" after "minimum". Add: "STC" |
07 Jun, 2018 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The China national standard 'Code for Design of Sound Insulation of Civil Buildings' (GB50118-2010) has been approved an acceptable method to comply with Feature 81, Part 1 when Dw levels under ‘High Limits’ are achieved. Note that projects must comply with the verification method according to Appendix D. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 15 Aug, 2018 To meet the requirements of Feature 82 Part 1 and 2, projects may implement the following strategies:
|
15 Aug, 2018 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 For Part 1a, add: "with more than 10 people" after "...and between rooms" |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 In Part 2a, remove: "employees". Add: "occupants" |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Part 1a, change “The building provides a thermal gradient of at least 3 °C [5 °F] across open office spaces…” to “The building provides a thermal gradient of at least 3 °C [5 °F] across open workspaces…” |
06 May, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add owner Letter of Assurance as required documentation, add on-site spot checks as required verification, remove visual inspection. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 15 Aug, 2018 As an alternative to Feature 83 Part 1, projects may use active chilled beams that integrate outdoor air supply, so long as the following conditions are met:
|
15 Aug, 2018 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In Feature introduction text, change “Additional benefits include saved floor space, lower dust transportation and increased thermal comfort through the separation of temperature controls and fresh air supply systems” to “Additional benefits include saved floor space, lower dust transportation and increased thermal comfort through the separation of temperature controls and outdoor air supply systems |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 Change Part 1 name from “Lobbies and Other Common Public Spaces” to “Lobbies and Other Common Spaces” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Amendment |
Type: Amendment
Post Date: 06 May, 2016 In feature introduction text, change “Health literacy, defined by the Institute of Medicine as…” to “Health literacy, defined by the National Academy of Medicine as…” |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "Prior to the design and programming of the project, all". Add: "Project" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 05 Feb, 2018 PeopleLOOK™ of the UK has been accepted as an equivalent for the Occupant Indoor Environmental Quality Survey of Feature 86 Part 1. Note that, in addition to the survey requirements in PeopleLOOK™, thermal comfort parameters must be surveyed twice a year. |
05 Feb, 2018 |
Equivalency |
Type: Equivalency
Post Date: 05 Feb, 2018 The Comfortmeter survey has been accepted as an equivalent for the Occupant Indoor Environmental Quality Survey of Feature 86 Part 1. Note that, in addition to the survey requirements in Comfortmeter, thermal comfort parameters must be surveyed twice a year. |
05 Feb, 2018 |
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Remove: "employees" after "10 or more". Add: "occupants" after "10 or more". |
26 Jul, 2017 |
Equivalency |
Type: Equivalency
Post Date: 14 Jul, 2017 The Building Use Studies (BUS) methodology of Occupant Satisfaction Evaluation has been accepted as an alternative for the Occupant Indoor Environmental Quality Survey required for Feature 86 Part 1. |
14 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 17 Jan, 2017 Change "…is given to a representative sample of at least 30% of employees at least once per year…" to "…is completed by a representative sample of at least 30% of employees at least once per year…" |
17 Jan, 2017 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The BOSSA Survey is an accepted alternative to the Occupant Indoor Environmental Quality Survey required for Feature 86, Part 1: Occupant Survey Content. |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The Green Star Innovation Challenge: Occupant Engagement is an accepted alternative to the requirements of Feature 86: Post-Occupancy Surveys. Therefore, compliance with the Green Star credit is sufficient to comply with the WELL feature. |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Equivalency |
Type: Equivalency
Post Date: 24 Oct, 2016 The Leesman Survey is an accepted alternative to the Occupant Indoor Environmental Quality Survey required for Feature 86, Part 1: Occupant Survey Content. |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add professional narrative as required documentation, remove annotated architectural drawing, remove on-site spot checks. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add professional narratives as required documentation, remove annotated architectural drawings, remove on-site spot checks. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 For Part 3, add: "a combination of" after "...through the provision of" |
07 Jun, 2018 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In part description, remove: "Areas". Add: "Projects with gross floor area" |
20 Oct, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 In part description, remove: "middle and high schools". Add: "primary and secondary schools" |
07 Jun, 2018 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 The requirements of Part 1b (provide employees with a 50% subsidy on software and/or applications that monitor daytime sleep-related behavior patterns such as activity levels, caffeine and alcohol intake, and eating habits) may be met if employees are provided free, doctor recommended software applications that meet these requirements. |
06 May, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 07 Jun, 2018 In part description, remove: "elementary, middle, and high schools". Add: "primary and secondary schools" |
07 Jun, 2018 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "or any other employer-established benefit plan designed to reimburse employees for qualified medical expenses" after "Flexible spending accounts" |
27 Apr, 2017 |
Equivalency |
Type: Equivalency
Post Date: 17 Jan, 2017 The 'Five Insurance' offered under the Labor Law of the People’s Republic of China has been approved as an acceptable method to comply with F92. |
17 Jan, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Parts 1, 2, and 3 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 26 Jul, 2017 Remove: "occupant" after "is made available to each". Add: "employee" after "is made available to each" |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Part 1 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Parts 1 and 2 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 24 Oct, 2016 Under Appendix D, change the feature type for Parts 1 and 2 from "(Protocol)" to "(Organizational Protocol)" |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 29 May, 2018 The Good Environmental Choice Australia (GECA) Furniture & Fittings (Level B) (FFv3.0-2017) standard has not been accepted as an alternative for the requirements of Feature 97 Part 1. Note that the intent of the feature is to promote material transparency along the supply chain. Feature 97 Part 1 requires that “the product must indicate that all ingredients have been evaluated and disclosed down to 1,000 ppm.” The GECA FFF&M v3.0-2017 standard does require products to disclose hazardous ingredients, but not all ingredients (including non-hazardous). |
29 May, 2018 |
Equivalency |
Type: Equivalency
Post Date: 29 May, 2018 The Good Environmental Choice Australia (GECA) Furniture, Fittings, Foam and Mattresses (Level A) (FFF&M v3.0-2017) standard has not been accepted as an alternative for the requirements of Feature 97 Part 1. Note that the intent of the feature is to promote material transparency along the supply chain. Feature 97 Part 1 requires that “the product must indicate that all ingredients have been evaluated and disclosed down to 1,000 ppm.” The GECA FFF&M v3.0-2017 standard requires products to disclose hazardous ingredients but not all ingredients (including non-hazardous). |
29 May, 2018 |
Equivalency |
Type: Equivalency
Post Date: 01 Mar, 2018 The Global GreenTag Standard v4.0 and PhD Methodology are accepted as an alternative to the requirements of Feature 97 Part 1. |
01 Mar, 2018 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "(in order to contribute, the product must indicate that all ingredients have been evaluated and disclosed down to 1,000 ppm)" after "the following material descriptions" |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Contractor Letter of Assurance as required documentation, add Owner Letter of Assurance as required documentation. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Equivalency |
Type: Equivalency
Post Date: 05 Feb, 2018 The GRESB certificate and policy document has not been accepted as an equivalent for JUST and G4 of Feature 98 Part 1. Note that JUST and G4 provide ample sections in their survey for addressing employee equity, transparency and disclosure, where GRESB assesses only some of these parameters in brief, multiple choice questions. |
05 Feb, 2018 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In part description, remove: "or WELL compliance" |
20 Oct, 2017 |
Equivalency |
Type: Equivalency
Post Date: 26 Jul, 2017 The Business Working Responsibly Mark has been approved as an acceptable alternative for Feature 98, Part 1. In order to fully comply with this feature, the results of the program must be publicly available within the project premises and on the entity's website. |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 06 May, 2016 A corporate annual report may be used to meet the requirements of Part 1 (Transparency Program Participation) if it meetings the following requirements: 1. The report includes information on each of the 22 JUST indicators (as applicable) as they apply to the organization as a whole, and areas where the organizational policies can be improved. 2. The report is publically available and employees are clearly made aware of how to access the report. |
06 May, 2016 |
Amendment |
Type: Amendment
Post Date: 10 Feb, 2016 In feature description language, change the last sentence from "This feature uses JUST participation to support fair and equitable organizations" to “This feature uses JUST participation and G4 Sustainability Reporting Guidelines to support fair and equitable organizations." |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Verification type |
Type: Verification type
Post Date: 20 Oct, 2017 In Verification Method, remove: "Visual Inspection". Add: "Professional Narrative" |
20 Oct, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 For kitchens that are no more than 3 m [10 ft] in any direction, the project team may use a ceiling height of 2.5 m [8.2 ft] in the kitchens. |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 For Feature 100, Part 3, the project team may include a seasonal water element in lieu of a perennial water element. For the remainder of the year, the element can be designed with appropriate vegetation, natural materials, or organic shapes, patterns and textures. The project team should also provide additional information regarding the element to visitors/occupants through an education display/placard located in the direct vicinity of the element. This display should be of sufficient size to include information such as the design concept or methodology, vegetation types, local context, etc. |
26 Jul, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Verification type |
Type: Verification type
Post Date: 10 Feb, 2016 Add Owner Letter of Assurance as required documentation, remove architect Letter of Assurance. |
10 Feb, 2016 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 For Part 1b, add: "to impact the occupants of the project or the general public in a positive manner" after "...WELL Building Standard" |
20 Oct, 2017 |
Type | Description | Post Date |
---|---|---|
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Amendment |
Type: Amendment
Post Date: 20 Oct, 2017 In 26 July, 2017 AAP, remove: "On an annual basis, projects must submit the following documentation to IWBI to demonstrate an active tour program: tour script, tour destination descriptions (including at least one destination per WELL concept), dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website)". |
20 Oct, 2017 |
Type | Description | Post Date |
---|---|---|
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 26 Jul, 2017 Projects can earn one Innovation feature by providing free tours of their WELL Certified space. Projects must include a WELL educational component in conjunction with the tours. This can be permanent signage throughout the space describing different WELL features, a case study surrounding WELL Certification, a newsletter or other printed/online publication following the occupants' engagement with WELL, or an approved alternative. Tours may be offered on a pre-determined schedule or upon request through the IWBI Event Request Form. In order to receive Innovation approval for an active tour program, projects must provide IWBI with the tour script and tour destination descriptions (including at least one destination per WELL concept) as part of their documentation. On an annual basis, projects must also submit the following documentation to IWBI: dates of tours (minimum of six per year), number of attendees (minimum of 50 per year), and evidence of how the project is broadcasting the availability of these tours (i.e., social media, project website). |
26 Jul, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Remove: "a. Describes how a feature normally not applicable to this project type is relevant to this project." |
27 Apr, 2017 |
Alternative Adherence Path |
Type: Alternative Adherence Path
Post Date: 27 Apr, 2017 Projects can earn one Innovation feature by engaging a WELL AP as a member of the project team. |
27 Apr, 2017 |
Amendment |
Type: Amendment
Post Date: 27 Apr, 2017 Add: "a. Goes above and beyond the current requirements of the existing WELL feature." |
27 Apr, 2017 |
Intent |
Type: Intent
Post Date: 24 Oct, 2016 In the Feature description, remove the second paragraph. Replace with the following text: |
24 Oct, 2016 |