Posted on: 07 Jun, 2018
Amendment: In Core & Shell Scope, remove: "Entire Building". Add: "Extent of Developer Buildout"
|
Posted on: 20 Oct, 2017
Amendment: For Part 5b, remove: "Project develops a plan to upgrade current mercury-containing lamp". Add: _“Project does not install any lamps not compliant with the low-mercury limits specified in Appendix C, Table A5. Project develops a plan to upgrade any existing non-compliant lamps to low-mercury or mercury-free lamps.”
|
Posted on: 20 Oct, 2017
Amendment: For Part 1c, add: "For door hardware, project teams must document attempt to meet the requirement and demonstrate a petition or a formal request has been filed with manufacturers who were unable to meet their needs." after "Not more than 100 ppm (by weight) added lead in all other building materials."
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "following guidelines". Add: "below guidelines, and a policy is put in place for future work"
|
Posted on: 20 Oct, 2017
Amendment: For Part 3a, remove: "or by a U.S. EPA accredited company experienced in asbestos assessment". Add: "or" before "accredited asbestos consultant..."
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "carry out the following:". Add: "For" before "any projects undergoing...". Add "the below guidelines are applied and a policy put in place for future work:" after "PCBs"
|
Posted on: 20 Oct, 2017
Amendment: In feature background, remove: "(Please refer to Table A3 for additional details.)"
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "buildings". Add: "projects"
|
Posted on: 20 Oct, 2017
Amendment: In part description, remove: "on buildings". Add: "of projects"
|
Posted on: 20 Oct, 2017
Amendment: In part description, add: ", demolition," after "For repair, renovation"
|